Power transformer factory acceptance test checklist

Power transformer factory acceptance test checklist

Why Power transformer factory acceptance test checklist is required ? Every power transformer has gone through 2 type of testing before charging.The  First testing is done at the factory, under the supervision of vendor( who purchase it) and the second testing is done after installation at the site. Actually, the manufacturer offers the pre-inspection check before dispatching the material from its store and all of the testing cost carried by the manufacturer. So many of the manufacturer try to hide or bypass some test. Every person has no idea which…

Read More